CE certification and CE Marking evaluation
In summary the CE Marking evaluation will include:
Design Review Meeting according to Electrical , Mechanical and P&ID Drawing .
Machinery Directive (2006/42/EC)
Low Voltage Directive (2014/35/EU)
EMC Directive (2014/30/EU)
Pressure PED Directive (97/23/EC)
ATEX Directive (2014/34 / EU )
-Report
-Technical Construction File (TCF)
-Certificate of Compliance
Low Voltage Directive CE Marking evaluation to include the following:
-A comprehensive evaluation of the equipment to the Low Voltage Directive utilizing harmonized standard EN 60204-1 or EN 61010, as appropriate.
-An informal Mechanical evaluation utilizing Annex I of the Machinery Directive.
-Internal Technical Peer Review.
-Closing meeting to verbally review list of discrepancy issues at the end of the on-site evaluation.
-An electronic copy of Bullet List Discrepancy Report issued within 3 working days following the On-site evaluation.
-An electronic copy of Final Evaluation Report issued within 14 working days following receipt of satisfactory responses to the Bullet List Discrepancy Report.
Machinery Directive CE Marking evaluation to include the following:
-A comprehensive evaluation of the equipment to the Machinery Directive utilizing appropriate harmonized standards (e.g., ISO 12100:2010, EN13849, EN13850 , EN13857, EN14122, EN 4413, EN4414, and EN60204-1 or EN61010).
-Internal Technical Peer Review.
-Closing meeting to verbally review list of discrepancy issues at the end of the on-site evaluation.
-An electronic copy of Bullet List Discrepancy Report issued within 3 working days following the On-site evaluation.
-An electronic copy of Final Evaluation Report issued within 14 working days following receipt of satisfactory responses to the Bullet List Discrepancy Report.